Site planning tool
Material calculator
Enter your slab, wall or plaster size — we work out the cement bags, TMT steel, sand, blue metal and bricks you need, then show how many lorry and tipper trips it takes to land it on your site.
Your measurements
Estimates follow standard IS mix proportions and typical steel percentages. Actual site consumption varies with wastage, workmanship and design — treat this as a buying guide, not a structural drawing.
Materials required
- Cement
- 29 bags
- 1.45 tonnes (50 kg bags)
- TMT steel
- 223 kg
- 0.22 tonnes
- Sand
- 53 cft
- 0.53 units
- Blue metal
- 105 cft
- 1.05 units
- Concrete volume
- 3.54 m³
- 125 cft wet volume
Delivery plan
4 vehicle trips to your site.
Cement29 bags (1.45 t)
Tempo / mini truck · 1 trip
Keep dry storage ready
TMT steel223 kg (0.22 t)
Mini truck (12 m rods need open body) · 1 trip
Needs 40 ft clear access for full-length rods
Sand0.53 units (53 cft · 2.38 t)
Tipper · 1 trip
Tipper needs space to raise the body
Blue metal / aggregate1.05 units (105 cft · 4.46 t)
Tipper · 1 trip