Site planning tool

Material calculator

Enter your slab, wall or plaster size — we work out the cement bags, TMT steel, sand, blue metal and bricks you need, then show how many lorry and tipper trips it takes to land it on your site.

Your measurements

Estimates follow standard IS mix proportions and typical steel percentages. Actual site consumption varies with wastage, workmanship and design — treat this as a buying guide, not a structural drawing.

Materials required

Cement
29 bags
1.45 tonnes (50 kg bags)
TMT steel
223 kg
0.22 tonnes
Sand
53 cft
0.53 units
Blue metal
105 cft
1.05 units
Concrete volume
3.54 m³
125 cft wet volume

Delivery plan

4 vehicle trips to your site.

Cement29 bags (1.45 t)

Tempo / mini truck · 1 trip

Keep dry storage ready

TMT steel223 kg (0.22 t)

Mini truck (12 m rods need open body) · 1 trip

Needs 40 ft clear access for full-length rods

Sand0.53 units (53 cft · 2.38 t)

Tipper · 1 trip

Tipper needs space to raise the body

Blue metal / aggregate1.05 units (105 cft · 4.46 t)

Tipper · 1 trip